Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.9752662

- Product Categories
- Friendly Links
Information Name: | How do MINGSHUI plastic track stadium company - how much money one square |
Published: | 2014-02-16 |
Validity: | 99999999 |
Specifications: | How do MINGSHUI plastic track stadium company - how much money one square |
Quantity: | 999999.00 |
Price Description: | |
Detailed Product Description: | How do MINGSHUI plastic track stadium company - how much money a square Heng Sheng Sports Facilities Engineering Co., Ltd. [Hotline: 15821851588 Customer Service QQ: 962830938] secondary qualifications, quality assurance - Heng Sheng Sports Facilities Co., Ltd. - the absolute advantage of price and quality stations is a professional manufacturer of artificial turf, rubber track kindergartens, schools, breathable plastic track, tennis courts, basketball courts, volleyball court, badminton court sports industry is a specialized company, including product design and material production, construction of prefabricated indoor multi-purpose sports venue. Silicon PU basketball court _ Construction Price Stadium construction techniques, materials: acrylic court, silicon pu stadium, stadium plastic EPDM granules, plastic basketball court - plastic basketball court prices. Base: A, cement (RC) base requirements 1. Reinforced concrete foundation must be laid face, the intensity level to reach the ground than the standard secondary roads. 2. Before laying the mud must Xianpu waterproof layer (depending on site-specific circumstances). 3. Around the field must use a complete drainage system must be open channel design. 4. Site drainage design using single-sided, draining slope should reach 4-8 ‰. 5. Flatness of the road to be met using 3m tape measure no more than 3mm pressure error. 6. Ground surface without cracking, sand, from powder. 7. The new cement foundation must do harden after curing 30 large (winter time postponed 1-2 times), in order to carry out the laying of the venue. 8. Before laying the stadium, the venue must be pickled and polished to ensure no grass surfaces to grease, oil, dust, mud and other debris. B, asphalt (AC) basis for requirements 1. Fundamentals must melt asphalt laying, prohibit the use of emulsified asphalt laying. Melt asphalt laying mixing ratio follow the national secondary road above criteria. 2. Around the field must use a complete drainage system must be open channel design. 3. Site drainage design using single-sided, draining slope should reach 4-8 ‰. 4. Flatness of the road to be met using 3 m tape measure pressure not exceeding 3mm errors. 5. Asphalt surface without peeling loose and cracking. 6. New asphalt must be made 20 days after hardening, in order to carry out site laying. 7. Before laying the stadium to ensure that no grease, oil, dust, mud and other debris on the ground grassroots. 8 plastic basketball court -. Plastic basketball court prices. How do MINGSHUI plastic track stadium company - how much money a flat floor areas: Heng Sheng Sports silicon PU basketball court Materials Company - different types of tennis court surface layer materials with different properties. Its technological features, construction technology, there are many different practical applications. Each of the surface layer of a tennis court, a feeling of the foot when running and tennis players bounce, ball produce different degrees of impact, so the owners roots under field conditions and their actual needs and then choose a different tennis scene layer material. Silicon PU basketball court _ Construction Price Heng Sheng sports company has specialized in producing polyurethane surfacing materials, chemical production plants, has a perfect professional equipment, advanced production technology and complete testing methods, while an accomplished senior experts from the Institute of rainbow elastic deep technology team. Breathable plastic track, mixed plastic runway, all plastic plastic runway, the plastic composite plastic runway runway project, plastic track materials, plastic runway construction, plastic runway paving machines, plastic runway glue, plastic runway rubber granules, 200 meters of plastic runway, 400 meters plastic track, 800 meters plastic runway plastic runway construction, plastic track laying, plastic track materials, plastic runway project contract, a plastic runway project, first-class quality engineering plastic runway, runway construction of high-quality plastic, silicon PU course material , silicon PU basketball courts, tennis courts silicon PU, PU stadium silicon, silicon PU grounds, water silicon PU, plastic runway tender schools, factories plastic runway project contracting market and honed through years of self-development, Heng Sheng Sports Facilities Co., Ltd. now has - ★ has the most leading stadium, track material production equipment. ★ with industry-leading polyurethane, silicon PU, acrylic product development laboratory. ★ annually 12,000 tons of silicon PU material, PU plastic material, acrylic material production capacity. ★ annual capacity of 6,000,000 square meters of pavement construction plastic surface and 10 million square meters of acrylic court surface layer. ★ sports venues for many years engaged in engineering design, construction, maintenance, experienced professionals and excellent management staff. |
Admin>>>
You are the 4245 visitor
Copyright © GuangDong ICP No. 10089450, Heng Sheng Sports Facilities Engineering Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 4245 visitor
Copyright © GuangDong ICP No. 10089450, Heng Sheng Sports Facilities Engineering Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility